KamuLab Expropriation and cadastral documents, automated
No manual correction needed
- Prepare expropriation plans, registration notices (declarations), survey sketches and line layouts
- Track expropriation processes
- Lay out every document automatically
- Transmission lines
- Distribution lines
- Pipelines
- Roads
- Dams and water works
- Cadastre
Runs on the web and on Windows. Outputs in DXF, KML and Word.
Built in Türkiye · adaptable to your country
Parcel recordSurvey sketch no. 96
- Block / parcel
- 815 / 605
- Title area
- 16943,58 m²
- Easement (IR)
- 1026,86 m²
- Correction
- 0,00
Registration noticeOne per parcel
DR:1Tower-site subdivision
Adaptable to your country
KamuLab was developed for expropriation and cadastral work in Türkiye. The software can be adapted to your country's procedures and document formats, and you receive the finished outputs, fast.
Your formatsAdapted to your procedure
Plan sheets, area tables, owner and parcel schedules, title blocks and naming rules are set up the way your authority asks for them.
Finished outputsDelivered ready to check
Plans, sketches, area tables, DXF and KML files and the delivery folders come out complete, without correcting every sheet by hand.
Fast results118 parcels in about 35 minutes
On a measured line in Türkiye, every declaration and sketch page for 118 parcels was produced in about 35 minutes. The time depends on the number of parcels and the speed of the computer.
Expropriation plan, land acquisition plan, parcel plan, easement or right-of-way plan: whatever your procedure calls it, the work is the same. The project line, the cadastre and the title records go in; a plan, an area table and the documents for every affected parcel come out.
Outputs become official documents only after a licensed surveyor has checked and approved them under your local rules.
What is KamuLab?
KamuLab is expropriation software developed by MapLab Tech. For power transmission and distribution lines, pipelines, roads, dams and water works, and cadastral work, it prepares the declarations, declaration sketches, survey sketches, coordinate summary tables, strip plans and the delivery package automatically. Outputs are DXF files that open and can be edited in CAD, KML for viewing on a map, and Word documents.
KamuLab prepares the expropriation file in one flow, from the tower list to the delivery package. It draws the line layout, overlays it on the cadastral base map and calculates the easement and tower-site area of every parcel. It produces the declarations, survey sketches and strip plans in the layout the authority requires.
- Authorities
- A separate profile for each authority's forms, sketches and delivery rules
- Input
- Tower list or project, cadastral base map and title records
- Output
- Declarations, declaration sketches, survey sketches, coordinate summary tables, district and village strip plans, KML, delivery folder
- Speed
- On a measured line, every declaration and sketch page for 118 parcels was produced in about 35 minutes
- Revisions
- When a tower site or the project changes, only the affected parcels are produced again; point names and numbers are kept
On a measured line, every declaration and sketch page for 118 parcels was produced in about 35 minutes. The time depends on the number of parcels, the number of section sheets for large parcels and the speed of the computer.
Which projects is it built for?
Each authority's forms, sketches and delivery layout are set up as a separate profile.
Transmission linesHigh-voltage power lines
Line layout and easement corridor, tower-site subdivision, registration notice and sketch for every parcel, district and village strip plans.
Distribution linesMedium- and low-voltage power lines
Registration notice and declaration sketch, survey sketch and coordinate summary table, village strip plan.
PipelinesOil and gas pipelines
Easement strip along the route, area calculation per parcel, declaration and sketch.
RoadsRoad expropriation
Expropriated and remaining areas in the parcels cut by the expropriation boundary, declaration and expropriation plan.
Dams and water worksArea expropriation
Areas per parcel where a whole area is expropriated, such as a reservoir or a facility site; declaration and sketch.
CadastreCadastre and cadastral renewal
Survey sketches and boundary determination documents in cadastral renewal; registration notices for subdivision, amalgamation, road dedication and new-parcel registration.
How does it work?
Four steps from the tower list to the delivery package. Click a step to see its real output.





Line layout and easement corridor
For every tower in the tower list, the tower site and the easement corridor between two towers are drawn. The overhead line and the underground cable route are shown separately; the easement strip of the cable section is calculated on its own. The line layout is transformed into whatever coordinate system the cadastral base map uses.

Cadastral overlay, subdivision and easement
The line layout is placed on the cadastral base map. Parcel boundaries are closed and every parcel the line crosses is found. In a parcel where the tower site is subdivided, the tower site (B) and the remaining area (A) are calculated separately; the easement area is derived on its own. When it is unclear which letter belongs to which part, the program asks the user instead of guessing.

Declaration and declaration sketch
For every parcel, the registration notice is filled in on the authority's form: province, district, neighbourhood, map sheet, block and parcel, area, land type, owner statement and type of transaction. The declaration sketch shows the parcel, the easement area and the tower site; tower sites too small to read are shown with their dimensions in enlarged detail boxes. Detail boxes, dimensions and point names are placed so that they never overlap each other or the drawing.
Survey sketch and coordinate summary table
The survey sketch shows the parcel corners, intersection points, frontage dimensions and side lengths. The coordinate summary table lists the coordinates of every point; the block/parcel table shows which points make up which parcel. Coordinate decimals and point naming follow the rules.

Large parcels: section sheets
A parcel that does not fit on one sheet at a readable scale is split into A3 or A4 section sheets. Every section sheet carries a section key; tower sites are shown with their dimensions in enlarged boxes. In the rare cases where the automatic layout does not fit, the program actually tries different scale options and leaves the choice to the user.

Strip plan
District and village strip plans are drawn along the line: line layout, cadastral parcels, expropriation areas, owner table and map-sheet sections. The district strip and the village strip are drawn at different scales.

Delivery package
All outputs are packaged in the folder structure the authority requires. Folders filled by KamuLab and folders the surveying office still has to add are shown separately; files that have no place in the structure are listed in the delivery report.

Sample outputs: transmission and distribution lines
The pages below come from two real deliveries in Türkiye, one for a power transmission line and one for a distribution line, in the formats the Turkish authorities require. For your country, the software can be adapted to produce the same documents in your formats. The “Full size” link under each image opens the page with the detail it has on paper.
Transmission lines

Full size (2 pages)

Full size (2 pages)

Full size (4 pages)

Full size (2 pages)

Full size

Full size
Distribution lines

Full size (2 pages)

Full size (2 pages)

Full size (4 pages)

Full size

Full size

Full size
Revisions
The project changes: a tower moves, a parcel is added. KamuLab finds the change and produces only the affected parcels again. Point names, numbers and files of the unchanged parcels stay exactly as they were. Revisions can be repeated as often as needed; every version is kept in the archive.
Process tracking and other modules
- Process trackingStage, settlement, court case, compensation and paperwork tracked parcel by parcel; click a parcel on the map to see its status.
- Heirs and right holdersThe list of living right holders, built from the kinship records of a deceased owner.
- Cadastral documentsDocument production for registration notices, survey and boundary determination, subdivision, road dedication, new-parcel registration and amalgamation.
- Cadastral renewalSurvey sketches and boundary determination documents in cadastral renewal work.
Checking and data security
KamuLab outputs open and can be edited in CAD. Outputs become official documents only after a licensed surveyor has checked them. Owner and personal data are processed on a server in Türkiye or in a local installation; every generation, download and sign-in is written to the usage log.
The images on this page are taken from a real project output. Province, district, neighbourhood, block/parcel numbers, personal names and coordinates have been changed.
Frequently asked questions
Can KamuLab be used outside Türkiye?
Yes. KamuLab was developed in Türkiye for power line, pipeline, road, water works and cadastral projects, and the software can be adapted to another country's procedures and document formats. You receive the finished outputs (plans, sketches, area tables, DXF and KML files) fast. Write to info@maplabtech.com with your project type and the documents your authority requires.
What kinds of projects is KamuLab used for?
Power transmission and distribution lines, oil and gas pipelines, roads, dams and water works, and cadastral and cadastral renewal work. Each authority's forms, sketches and delivery layout are set up as a separate profile.
Which files are needed?
The tower list (for the line layout) or the project showing the area to be expropriated, the cadastral base map of the area and the title records are enough.
In which formats are the outputs?
Declarations, declaration sketches, survey sketches and strip plans are produced as DXF files that open in CAD, lines and areas as KML, and paperwork as Word (docx).
How long does it take for hundreds of parcels?
On a measured line, every declaration and sketch page for 118 parcels was produced in about 35 minutes. The time depends on the number of parcels, the number of section sheets for large parcels and the speed of the computer.
If a tower site or the project changes, does everything have to be prepared again?
No. In a revision only the affected parcels are produced again; point names and numbers of the unchanged parcels are kept.
Are the program's outputs official documents as they are?
No. Outputs become official documents only after a licensed surveyor has checked and approved them.
How are large parcels shown?
A parcel that does not fit on one sheet is split into A3 or A4 section sheets; every sheet has a section key and enlarged boxes for the tower sites.
Information about KamuLab
To see KamuLab with your own project's data, write to us: info@maplabtech.com
Request information
MapLab Tech holds the Technology Entrepreneurship Badge of Türkiye's Ministry of Industry and Technology.